- Version. 1.0, 24 October 2026
- Last updated. 24 October 2026
- Applies to. The calculation module and the measuring module of the Estimating add-on: rates, amounts, adjustments, spreads, the tender price, GST, quotes brought into the price, quantity take-off, and the checks on all of them.
- Read with. The Estimating add-on terms (clauses 6, 8 and 10) and the TenderBuilt Terms.
- Every number you put in stays yours. TenderBuilt only does the arithmetic on it, and never makes up a rate, a quantity, a percentage, a factor or a scale.
- The arithmetic is exact. Quantities, rates and amounts are held as exact decimals, never as approximations.
- Each figure is rounded once, half away from zero, when it is worked out: quantities to three decimal places, rates to four, amounts to the cent.
- Adjustments are percentages of the direct cost, or fixed amounts. A spread adds up to the cent, and every version is reconciled to the cent before it can be approved.
- Take-off measures what your people mark, at the scale they set, to three decimal places.
- Before you lodge, the buyer’s own template is checked against the estimate, and any difference of a cent or more is shown to you.
This box is a summary. The clauses below decide.
What this document is.
What it describes, and what it does not.
1. What this document is
1.1This document describes each figure the Estimating add-on works out: what it is worked out from, the arithmetic, and where and how it is rounded. Clause 8.1 of the Estimating add-on terms promises that the calculation module and the measuring module work as this document describes. A figure that does not is a calculation defect, and clause 10 of those terms says what we then do.
1.2This document does not describe the numbers you or your people provide: quantities, rates, on-costs, productivities, waste and delivery allowances, conversion factors, percentages, fixed amounts, the GST rate, a drawing’s scale, or the points marked on a drawing. Those are yours. Nor does it describe what a model reads from a document or the flags it raises, which are proposals for a person to confirm, or the buyer’s own formulas, which we evaluate only to check them (clause 22).
1.3Each version of this document is dated, and every earlier version is kept: we send any of them on request to info@tenderbuilt.com.au. A material change to it is made as clause 12 of the TenderBuilt Terms describes, because it changes what we promise.
2. Where figures are worked out
2.1One calculation module works out every rate, amount, adjustment, spread and total. One measuring module works out every take-off measurement. Your browser uses the same modules to show a figure as you type, but the figure that is saved, approved and exported is the one our servers work out.
2.2The server works the whole version out again, and saves each item’s amount and the tender price that result, after every change to the version’s items, build-ups or adjustments. Whenever a version is shown, approved or exported, it is worked out again from its inputs and compared with what was saved. Clause 21 describes that check.
How exactly numbers are held, and how they round.
The precision of each kind of figure, and the one rounding rule.
3. Precision
3.1The calculation module holds every figure as an exact decimal: a whole number of its smallest unit. It uses no floating-point arithmetic, so a figure never picks up a stray fraction of a cent. Each kind of figure is held to a fixed number of decimal places:
- Decimal places. 3
- Example. 120.500 m
- Decimal places. 4
- Example. $186.2500 per m
- Decimal places. 2 (whole cents)
- Example. $27,039.82
- Decimal places. 4
- Example. 5.4500%
- Decimal places. 6
- Example. 2.200000 t per m³
- Decimal places. 3
- Example. 0.150 m
- Decimal places. 6
- Example. 5.000000 m
- Decimal places. 12
- Example. 0.050000000000 m per drawing point
- Decimal places. 1
- Example. 26.5 weeks
3.2A number you type may include commas. If it has more decimal places than its kind holds, it is rounded to that many places by the rule in clause 4 when you enter it, and the rounded figure is what is saved and shown.
4. Rounding
4.1Every rounding is half away from zero: a figure exactly halfway between two values goes to the one further from zero. To the cent, $2.345 becomes $2.35 and −$2.345 becomes −$2.35.
4.2A figure is rounded once, when it is worked out, to the precision of its kind in clause 3. A figure worked out from it uses it as rounded. So an item’s rate is the sum of its build-up lines, each already held to four decimal places; and an item’s amount is its quantity times that rate, rounded to the cent.
Rates from your library.
Labour all-in rates, dated rates and crews.
5. Labour all-in rates
5.1A labour rate is your base hourly rate plus each on-cost you add. An on-cost is either a percentage of the base rate, worked out and rounded to four decimal places, or an amount an hour. The all-in rate is the base plus every on-cost, and each on-cost is shown beside it.
5.2For example, a base of $40.0000 an hour with superannuation at 12%, payroll tax at 5.45% and workers’ compensation at $1.50 an hour gives on-costs of $4.8000, $2.1800 and $1.5000, and an all-in rate of $48.4800 an hour.
6. Dated rates
6.1Each rate in your library takes effect from a date you give, and may have a date it runs to. A new rate never overwrites an earlier one. The rate in force on a day is the one with the latest start date on or before that day that has not run out.
6.2A build-up takes each rate in force on the day the build-up is set, and records which rate it used. A rate you add later does not change a build-up already set: it is used the next time the build-up is set, or an assembly or past estimate is copied in. The rates report shows the rates an estimate used beside the rates in force today.
7. Crews
7.1A crew is made of labour and plant resources, with how many of each. Its hourly cost is the sum, for each member, of how many times that member’s rate in force, each rounded to four decimal places. A crew cannot be used while any member has no rate in force.
7.2For example, two labourers at $48.4800 an hour and one excavator at $150.0000 an hour cost $246.9600 an hour.
An item’s rate.
How each line of a build-up contributes, and how assemblies and unit conversions work.
8. Build-up lines
8.1An item’s rate is built up from lines. Each line’s part of the rate is worked out and rounded to four decimal places as follows:
(a)a crew at a productivity: the crew’s hourly cost divided by the units it does an hour (which must be more than nothing). At 12.5 m an hour, the crew above gives $19.7568 per m;
(b)a crew in hours per unit: the crew’s hourly cost times the hours per unit;
(c)a resource: its rate times the quantity used per unit; plus waste, which is that figure times the waste percentage; plus delivery, which is the delivery rate times the quantity used per unit. Pipe at $186.2500 per m, 1 m per m, 2% waste and $3.10 per m delivery gives $186.2500 + $3.7250 + $3.1000 = $193.0750 per m;
(d)a selected quote: the quote’s rate for the item, excluding GST, as clauses 16 and 17 work it out; and
(e)a lump sum: the amount divided by the item’s quantity. $1,500.00 over 120 m gives $12.5000 per m.
8.2The item’s rate is the sum of its lines’ parts, with no further rounding: in the examples above, $19.7568 + $193.0750 + $12.5000 = $225.3318 per m. An item with no quantity, such as a lump-sum item, is built up as a quantity of one. When the item’s quantity changes, its rate is worked out again from its lines as they were set, with the same hourly costs, dated rates and quote rates, so a lump-sum line still adds up to its amount, to within the rounding of the rate to four decimal places. A rate added to the library later is used only when the build-up is set again (clause 6.2).
9. Assemblies and past estimates
9.1An assembly keeps a build-up’s lines with their quantities, productivities, waste and delivery allowances and lump sums, but no rates. Using an assembly, or copying an item from a past estimate, copies those lines into the item and prices them at the rates in force on the day it is done (clause 6). A line priced from a quote is never kept in an assembly.
9.2If the item is in a different unit from the assembly, a person must first type a conversion factor: how many of the assembly’s units are in one of the item’s. TenderBuilt never assumes one, such as a density. The lines are then converted: each quantity used per unit and each hours per unit is multiplied by the factor, each productivity is divided by it, all rounded to three decimal places, and a lump sum stays as it is. A productivity that rounds to nothing is refused.
An item’s amount.
Quantity times rate, the schedule’s rounding rule, and what each kind of item counts for.
10. Quantity times rate
10.1A measured item’s amount is its quantity times its rate, rounded to the cent: 120.500 m at $225.3318 per m is $27,039.82 (exactly $27,039.8169).
10.2A person sets, on the version being worked on, how the buyer’s schedule rounds. The usual rule, and the one a new estimate starts with, is rates as typed and amounts to the cent. A new version takes the rule of the version it was made from, and the rule of an approved or submitted version never changes. The other rules are:
(a)rates to whole cents: the rate is rounded to the cent before it is multiplied (the same item is then 120.500 × $225.33 = $27,039.60); and
(b)amounts to the whole dollar: the exact amount is rounded once, to the whole dollar. An exact $10.495 becomes $10, and $10.50 becomes $11.
11. What each kind of item counts for
11.1Each item has a kind, which a person confirms. The kind decides its amount and whether it is in the tender price:
- Amount. Quantity times rate (clause 10)
- In the tender price?. Yes
- Amount. The price typed for it, or its built-up rate as a quantity of one
- In the tender price?. Yes
- Amount. The amount the buyer states, carried as stated and never priced
- In the tender price?. Yes, at the stated amount, but not in the direct cost
- Amount. Quantity times rate, or a price typed for it
- In the tender price?. Only when a person includes it
- Amount. None: a rate with no quantity
- In the tender price?. No
- Amount. None
- In the tender price?. No
11.2An item that would be in the tender price is left out of it, and listed with the reason, while it is unconfirmed, or while it is unpriced because it has no amount. A version cannot be sent for approval while any item is unconfirmed, and the price approver must give a reason to approve a version with unpriced items.
Adjustments, spreads and the tender price.
From the direct cost to the price excluding and including GST.
12. The direct cost
12.1The direct cost is the sum of the amounts of every item in the tender price (clause 11), before any adjustment is spread onto them, leaving out provisional sums and prime-cost items.
13. Adjustments
13.1An adjustment is overheads, margin, contingency, risk, escalation, a provisional allowance, a discount, rounding or preliminaries. A person types each one as either a fixed amount, which may be negative (a discount), or a percentage of the direct cost, worked out and rounded to the cent.
13.2Every percentage is a percentage of the direct cost alone. Percentages are not compounded: 10% overheads and 5% margin on a direct cost of $8,000.00 are $800.00 and $400.00, not $800.00 and 5% of $8,800.00.
14. Kept or spread
14.1A person chooses, for each adjustment, whether it is kept as its own line in the price or spread onto the items. It can be spread over every item in the direct cost, over the items marked as preliminaries, or over items a person chooses (only those in the direct cost count).
14.2A spread is shared between its items in proportion to their amounts before spreading, by the largest remainder method, so that the shares add up to the adjustment exactly. Each item first gets its exact share rounded down to the cent. Any cents left over then go one at a time to the items whose exact shares had the largest fractions of a cent left; where two are equal, the one earlier in the schedule goes first. A negative adjustment is shared the same way. For example, $100.00 spread over three items of $1,000.00 each gives $33.34, $33.33 and $33.33.
14.3An adjustment with no item to spread onto is kept as its own line instead, so it is never lost. An item’s amount in the price is its own amount plus its share of every spread.
15. The tender price and GST
15.1The tender price excluding GST is the sum of the amounts, including spreads, of every item in the tender price, plus every kept adjustment.
15.2For example, take two measured items of $5,000.00 and $3,000.00, a provisional sum stated at $5,000.00, and an option of $2,000.00 that is not included. The direct cost is $8,000.00. Overheads of 10% ($800.00) spread over the two measured items give them $5,500.00 and $3,300.00. Margin of 5% ($400.00) is kept. The tender price is $5,500.00 + $3,300.00 + $5,000.00 + $400.00 = $14,200.00.
15.3GST is the tender price times the GST rate your client administrator recorded, rounded to the cent, and the price including GST is the two added together: at 10%, $1,420.00 and $15,620.00. TenderBuilt supplies no GST rate. If you record that the business is not registered for GST, no GST is added. A version cannot be sent for approval until the GST record is made.
15.4A duration in weeks for the time-related costs is typed by a person and kept with the version. TenderBuilt does not schedule from it or work anything out from it.
Quotes brought into the price.
Converting to GST-exclusive figures, and splitting a quote across its items.
16. Quotes excluding GST
16.1Quotes are compared and priced excluding GST. A figure given including GST is divided by one plus the GST rate your client administrator recorded, rounded to its precision: $110.0000 at 10% becomes $100.0000. If your business is not registered for GST, GST is a cost to you, so quotes are compared and priced as they were given.
17. A selected quote
17.1When a person selects a quote, they confirm its figures, and the items it covers are priced from it:
(a)for a quote with a rate for each item, each item’s share is its quantity times the quote’s rate, rounded to the cent (an item with no quantity takes the rate, rounded to the cent, as its amount), plus any allowance a person typed against that item;
(b)a lump-sum quote, or an allowance against the whole quote, is shared between the items either as a person types each item’s share, which must add up to it to the cent, or in proportion to the items’ quantities by the largest remainder method in clause 14; and
(c)each item then gets a quote line at its share divided by its quantity, rounded to four decimal places, or at its share if it has no quantity.
17.2The item’s amount is then worked out from its rate in the usual way (clause 10). Because that rate is held to four decimal places, the item’s amount can differ from its share of the quote by a few cents when the quantity is large. The selection records the shares as they were split.
Measuring from drawings.
How the measuring module turns points and a scale into lengths, areas, volumes and counts.
18. Points and the scale
18.1A point your people mark on a drawing is held as two whole numbers: how far across and how far down the page it is, in millionths of the page’s width and height as the PDF file gives them, before the page is turned for showing (clause 18.4). A drawing point is the PDF unit of 1/72 of an inch.
18.2A page’s scale is set by a person: they mark two points and type the real distance between them, in metres. The scale is that distance divided by the distance between the two points in drawing points, in metres per drawing point, rounded to twelve decimal places. A scale of 0.000001 or less, or 1,000 or more, metres per drawing point is refused as a slip. For example, two points 100 drawing points apart that are really 5 m apart give a scale of 0.050000000000 m per drawing point.
18.3Each measurement keeps the scale it was worked out at. Setting a page’s scale again changes no measurement already made.
18.4A page that the PDF says is turned (most drawing sets are) is shown turned, as it is meant to be read. A point you mark on it is turned back onto the page’s own axes before it is kept, so the way a page is shown changes no point, scale or figure.
19. Lengths, areas, volumes and counts
19.1The measuring module works out each kind of measurement as follows:
(a)A length is the sum of the straight distances between each point and the next, times the scale. It needs at least two points, and two points in a row may not be the same.
(b)An area is the area of the closed shape through the points, by the shoelace (surveyor’s) formula, times the scale squared. It needs at least three points, two points in a row may not be the same, and the sides may not cross or double back on one another.
(c)A volume is an area, rounded as clause 19.2 says, times a depth in metres that a person types, rounded to three decimal places.
(d)A count is the number of points marked: one for each thing counted.
19.2A length or area is rounded once, half away from zero, to three decimal places. It is worked out only with addition, subtraction, multiplication, division and the square root, which every computer does to the same last digit, so the server and your browser always agree, and the server’s figure is the one kept. With the scale above, a line of 400 then 300 drawing points is 35.000 m; a rectangle of 400 by 300 drawing points is 300.000 m²; and that area at a depth of 0.150 m is 45.000 m³.
20. Applying measurements to an item
20.1A person links measurements to an item and applies them. The item’s quantity is then the exact sum of the linked measurements, which must all be of one kind, in the item’s unit:
(a)a length gives metres, or kilometres (the metres divided by 1,000 and rounded to three decimal places);
(b)an area gives square metres, a volume cubic metres, and a count a number (each).
20.2Any other unit is refused, and nothing is converted. The quantity is recorded as measured, with who applied it and when; the buyer’s quantity is kept beside it and the change is flagged; and the item stays unconfirmed until a person confirms it.
How the figures are checked.
The reconciliation of every version, and the check of the buyer’s template before lodgement.
21. The reconciliation
21.1Every version of an estimate is reconciled, and the result is shown with it. The reconciliation confirms that:
(a)the tender price is the sum of the item amounts in the price plus the kept adjustments, to the cent;
(b)the shares spread onto items, plus any adjustment kept because it had nothing to spread onto, add up to the adjustments that were to be spread, to the cent; and
(c)each item’s saved amount, and the saved tender price, are exactly what the calculation module works out again from the version’s inputs. A figure changed by any other route fails this.
21.2A version that does not reconcile cannot be approved. The estimating reports split each item’s amount across labour, plant, materials, subcontract and other by its build-up lines’ shares, by the largest remainder method, and a crew’s line between its labour and plant by their hourly costs, so the report’s totals equal the estimate’s to the cent.
22. The buyer’s template
22.1When a version is written into the buyer’s template, each item is shown as the buyer is to see it, with every spread included. Its rate is its own rate, or, if anything was spread onto it, its amount divided by its quantity, rounded to the cent. A provisional sum or prime-cost item keeps the buyer’s stated amount.
22.2In an Excel template, TenderBuilt writes each item’s rate (except for a lump sum) and amount (except for a rate-only or daywork item), and writes an amount only where the amount cell holds no formula. It never edits a formula, and writes nothing on a provisional sum or prime-cost row. It then works out what each of the buyer’s formulas now gives, using numbers, text, cell references and ranges, the arithmetic and comparison operators, and SUM, SUMPRODUCT, ROUND, ROUNDUP, ROUNDDOWN, MIN, MAX, ABS, IF, IFERROR, AND, OR and NOT, rounding half away from zero as Excel does. A formula using anything else is listed as not checked, never guessed. The file is set to recalculate when it opens, so Excel shows the buyer’s formulas’ own answers.
22.3Each item’s amount and each total the template shows are then compared with the estimate. They differ when they are a cent or more apart. The last total excluding GST is taken as the template’s tender total, and a total including GST is compared too. A lodgement copy is given only when nothing differs, nothing is missing and nothing is unchecked, or once your price approver has recorded which total is the tender price.
22.4A Word template has the rates and amounts written into its schedule tables, and its total rows take the tender price. Word does not calculate, so there is nothing to compare. A PDF is filled only through form fields matched by name; one that cannot be filled is laid out by TenderBuilt for you to transcribe.
22.5A version that is not approved, or that uses a feature withdrawn under clause 23, is exported only as a review copy marked DRAFT on every page or sheet.
Calculation defects, and known limits.
What counts as a defect, what happens then, and what the product does not yet do.
23. Calculation defects and withdrawal
23.1A calculation defect is a figure the calculation module or the measuring module works out that is not what this document says it gives from the same inputs. It is not a calculation defect if the cause is a number you or your people provided, a buyer’s formula, something a model read or flagged, the absence of a flag, or a limit listed in clause 24.
23.2If we find or are told of a calculation defect, we can withdraw the feature it is in: assemblies, copying from a past estimate, pricing from a selected quote, spreading adjustments over items, importing an estimate workbook, applying an addendum, comparing versions of the summary, or quantity take-off from drawings. While a feature is withdrawn it takes no new work, every estimate that used it shows the defect and exports only as a DRAFT review copy, and the client administrators and price approvers of the workspaces using it are told by email, with no figures in it. Clause 10 of the Estimating add-on terms sets out the rest.
24. Known limits
24.1As at the date of this version:
(a)If a measurement changes after it was applied to an item, the item shows that its measurements have changed, and keeps its quantity until a person applies them again.
(b)A rate added to the library after a build-up was set does not change that build-up until it is set again (clause 6.2).
(c)A buyer’s Excel formula using a function not listed in clause 22.2 is reported as not checked, for you to check in Excel.